วันอังคารที่ 11 ตุลาคม พ.ศ. 2554
Short circuit protection.
เขียนโดย
tongsukh
ที่
21:26
Electrical short circuit protection structure remark. They can be divided into categories such as electrical wiring, old or expired applications. Viewed from isolation to crack. Or dry the skin. Wire insulation damage caused by rats gnawing or insect bite, or place heavy objects on the wire near sources of heat. The clean cut. The wire should be tight, the surface coated or PVC must not be torn.Thousands of isolation from the size of the power to choose the wire size must be suitable for the amount of electricity flowing through a wire or suitable for use in a circuit or for the organization of the cables can not walk. near sources of heat, chemicals or heavy cover. It 'easy to damage the insulation and cause electrical short-circuit it. Cables should not be sitting position, resting on a steel frame. Iron fence - steel rail. Or metal. Otherwise, the power grid. The cleat opposite. The pipeline was completed. To prevent current leakage in the structure of metal. This can lead to danger.Case of loss or damage to wiring. Electric cables and power lines damaged surveillance. And other items that should not be ignored.The socket outlet must not be broken. It burns. The intake and output must be tight. The line size correctly when connected to power lines or electrical outlet, the outlet must be securely installed in the dry, not wet or submerged. It should be out of reach of children. Panel power switch. It must be installed in a dry place. Do not wet and high enough away from flammable chemicals and a variety should be checked to see if there are ants. Insecticide is not found in the nest with the removal process. Do not place any obstacles around the switch panels, the layout of the circuit must be connected to the panel a short circuit to a metal cabinet must be grounded. The transfer of power cut off. And 'much needed to repair the building with electricity in some areas of the building if the building has been cut out of one. I cut the distribution. Each point, it would be difficult to repair the electrical system to shut down the entire building. Therefore, the choice of cut-out must be appropriate to the area of the building and the amount of power to the point where it will be suitable for building. And the amount of electricity cut. Capacity. Buying Cut. The lid should not be broken.The internal nature. Fuse must be sized and sealed with the lid closed. Do not use other materials instead of following the fuse called Kae cut off when the helicopter used to be tight. Especially during the last season. Need to be sure the electrical wiring in a more compact structure of the roof and wall leaks, if there is any point must not be altered or repaired. Otherwise, when the rain normal. You may need to destroy water systems. Within office buildings and, in that, apart from the infrastructure, power over the power panel, power cut and then used in office buildings is also equally important, because it can cause a fire up. The air conditioning in the summer everyone wants to use the air conditioning, but when the rainy season and winter. The air conditioning is not used. Inspection. The air conditioning is very simple. I can handle this. The loss of power or not. Using the screwdriver, he found that the leakage current must be used to repair a power line connected to the air conditioning. The coordinates of the correct size with the use of air conditioning and cable entry points in each end point. The tightening and closing the lid or Thousands were isolated. Air should not install near flammable substances. Operating rooms are very noisy, irregular.Should be checked and corrected. Do not turn off air conditioning when no one else in the office building. These little things that do not pay attention to the equipment properly. It 'been damaged or destroyed and could be a threat to lives and property.


0 ความคิดเห็น
แสดงความคิดเห็น